This is the main plan for my tracks, each block is 50 cm wide so the total
lenght is about 5,50 meters, and both tables will be 2 meters deep. There will be 3 stations and
villages, in the village of Toici will be a big copper mine and a wood cutting factory. In Monici you will find a big maintainace area, several warehouses and places for loading the coals. For the village Elici plans need to be develloped.

In the next picture you see also the mountain areas, the difference between the lowest part and the highest tracks is about 50 cm.
This is the basic idea how it will be, in a few years. The plan is created with
Drail, an easy program to
develop tracks. ( you can find it at
http://www.drail.nl/, it's a dutch side, but
English is available)
No comments:
Post a Comment